Converting switches & signals
Old Geaser
post Jul 27 2008, 11:15 PM
Post #1


Train Master
*****

Group: Members
Posts: 82
Joined: 22-November 07
From: Gold Bar, WA
Member No.: 125



Well I must be doing something wrong. Every time I start making a new act, I click the Convert switches to manual and Convert signals to permissive.

I get the pop up saying something about switches have been changed. Same for signals. I seem to have no problem with some acts, but on the longer one where I do a little traveling, I cannot throw some switches, or get by the light.

Is there something else I have to do ? I am on one now on the revised East Metro, that has pu and so at CL LL Coal plant and I cannot get off the main at either end of the coal plant. Must be doing something wrong. Thanks

Bert wink.gif

Go to the top of the page
 
+Quote Post
 
Start new topic
Replies
Old Geaser
post Jul 28 2008, 09:29 AM
Post #2


Train Master
*****

Group: Members
Posts: 82
Joined: 22-November 07
From: Gold Bar, WA
Member No.: 125



Thanks Norm and Steve

I fecal better now that it has been explained to me. I had a problem at the same location on one of the original activities. I was not able to get off the main at the 1st entry. Was able to back in at the 2nd entry. I will try it again and if I cannot get in I will go on and make another, not using the coal plant.

Speaking of the Stevens Pass route, I live about 1\2 mile from the route here In Gold Bar, WA. I can see the trains in between the trees. We are in the Cascade Mt foothills, about 18 miles from the 8 mile tunnel. Thanks again

Bert
Go to the top of the page
 
+Quote Post

Posts in this topic


Reply to this topicStart new topic
1 User(s) are reading this topic (1 Guests and 0 Anonymous Users)
0 Members:

 



Lo-Fi Version Time is now: 27th December 2025 - 03:07 AM
viagra super force bitcoin