IPB
viagra super force buy buy online

Welcome Guest ( Log In | Register )

Changing Switches Lock Up
loqtes
post Oct 14 2008, 06:53 PM
Post #1


Conductor
**

Group: Members
Posts: 10
Joined: 16-September 08
Member No.: 185



OK, new question...I have the most current version of AG 4.2.11. I fire up the program and do not load an activity. I click on the button to change the switches to manual and then click on the route and the appropriate TDB file. The response is that the database was successfully back up and then the computer locks up. If I do a control-alt-del it shows AG as Not Responding. It does not matter which route I do this with the result is the same with the exception for some reason of the tutorial route which it seems to work with, without locking up. Any ideas? thanks...dave
Go to the top of the page
 
+Quote Post
 
Start new topic
Replies
dgionet
post Oct 16 2008, 05:41 PM
Post #2


Train Master
*****

Group: Members
Posts: 1,028
Joined: 4-February 07
From: Canada
Member No.: 21



Hi Dave,

To add to Jim's comment about delays encountered in changing the signal or switches mode, some of the route TDB files like the Wupper 11 template (size 15MB) can take close to a minute to see the second window confirming the change.

The TDB file of the upcoming and massive Monon 2 route will probably take as much time. The TDB file is around 14.5MB . The bigger the TDB file the longer will be the time to change the switches or signalling mode.

Cheers

rolleyes.gif


--------------------
Denis Gionet
Go to the top of the page
 
+Quote Post

Posts in this topic


Reply to this topicStart new topic
1 User(s) are reading this topic (1 Guests and 0 Anonymous Users)
0 Members:

 



Lo-Fi Version Time is now: 1st December 2025 - 02:45 PM
viagra super force bitcoin