Impossible Activities |
Impossible Activities |
![]()
Post
#1
|
|
![]() Switchman ![]() Group: Members Posts: 9 Joined: 28-April 07 From: United States Member No.: 57 ![]() |
In my learning experience with Activity Generator I noticed that AG sometimes generates activities that are impossible to complete. Using a template for the L&PS I generated a simple switching activity. The options used were:
Source Track: CN Interchange Work Tracks: 1 Region - London (the CN Interchange is in this region). Final Destination: L Track 4 - E London "Allow pickups from source tracks in one region to be set out in that same region." AG generated the following work order: CODE Activity created by Activity Generator Version 4.2.11 REGION------------TRACK NAME-----------------WORK----CONSIST-CAR#-CAR DESCRIPTION-----TYPE-NOTES/INSTRUCTIONS----------- London CN Interchange PICKUP 32783 0 MNA3240-XM XM DEST: L Track 4 London CN Interchange PICKUP 32783 1 NP47919-XM XM DEST: L Track 4 London CN Interchange PICKUP 32783 2 LPS200-FMlumber FMlu DEST: L Track 4 London CN Interchange PICKUP 32783 3 ACD28753-VA VA DEST: L Track 4 London CN Interchange PICKUP 32783 4 SPS2003-XM XM DEST: L Track 4 London L Freight Shed 1 PICKUP 32781 0 LPS3-XM XM DEST: L Track 4 London L Freight Shed 2 PICKUP 32782 0 GN25096-XM XM DEST: L Track 4 London L Freight Shed 2 PICKUP 32782 3 LPS5-XM XM DEST: L Track 4 London L Freight Shed 2 SETOUT 32783 4 SPS2003-XM XM FROM: CN Interchange London L McManus Coal Trestle PICKUP 32768 0 LPS5-XM XM DEST: L Track 4 London L MCR Freight Shed N SETOUT 32783 0 MNA3240-XM XM FROM: CN Interchange London L MCR Freight Shed N SETOUT 32783 1 NP47919-XM XM FROM: CN Interchange London L MCR Team PICKUP 32775 1 LPS212-FMcrates FMcr DEST: L Track 4 London L MCR Team SETOUT 32783 2 LPS200-FMlumber FMlu FROM: CN Interchange London L MCR Team SETOUT 32783 3 ACD28753-VA VA FROM: CN Interchange E London L Track 4 SETOUT 32768 0 LPS5-XM XM FROM: L McManus Coal Trestle E London L Track 4 SETOUT 32775 1 LPS212-FMcrates FMcr FROM: L MCR Team E London L Track 4 SETOUT 32781 0 LPS3-XM XM FROM: L Freight Shed 1 E London L Track 4 SETOUT 32782 0 GN25096-XM XM FROM: L Freight Shed 2 E London L Track 4 SETOUT 32782 3 LPS5-XM XM FROM: L Freight Shed 2 E London L Track 4 SETOUT 32783 0 MNA3240-XM XM FROM: CN Interchange E London L Track 4 SETOUT 32783 1 NP47919-XM XM FROM: CN Interchange E London L Track 4 SETOUT 32783 2 LPS200-FMlumber FMlu FROM: CN Interchange E London L Track 4 SETOUT 32783 3 ACD28753-VA VA FROM: CN Interchange E London L Track 4 SETOUT 32783 4 SPS2003-XM XM FROM: CN Interchange As you can see all of the pickups from the CN Interchange have 2 destinations, an industry in London AND L Track 4 in E London. Consequently, it is not possible to successfully complete the activity. Is this something else I am doing wrong or is it an "undocumented feature"? ![]() -------------------- ...rich
|
|
|
![]() |
![]()
Post
#2
|
|
Train Master ![]() ![]() ![]() ![]() ![]() Group: Members Posts: 287 Joined: 6-January 07 From: United States Member No.: 14 ![]() |
In my learning experience with Activity Generator I noticed that AG sometimes generates activities that are impossible to complete. Using a template for the L&PS I generated a simple switching activity. The options used were: Source Track: CN Interchange Work Tracks: 1 Region - London (the CN Interchange is in this region). Final Destination: L Track 4 - E London "Allow pickups from source tracks in one region to be set out in that same region." AG generated the following work order: CODE Activity created by Activity Generator Version 4.2.11 REGION------------TRACK NAME-----------------WORK----CONSIST-CAR#-CAR DESCRIPTION-----TYPE-NOTES/INSTRUCTIONS----------- London CN Interchange PICKUP 32783 0 MNA3240-XM XM DEST: L Track 4 London CN Interchange PICKUP 32783 1 NP47919-XM XM DEST: L Track 4 London CN Interchange PICKUP 32783 2 LPS200-FMlumber FMlu DEST: L Track 4 London CN Interchange PICKUP 32783 3 ACD28753-VA VA DEST: L Track 4 London CN Interchange PICKUP 32783 4 SPS2003-XM XM DEST: L Track 4 London L Freight Shed 1 PICKUP 32781 0 LPS3-XM XM DEST: L Track 4 London L Freight Shed 2 PICKUP 32782 0 GN25096-XM XM DEST: L Track 4 London L Freight Shed 2 PICKUP 32782 3 LPS5-XM XM DEST: L Track 4 London L Freight Shed 2 SETOUT 32783 4 SPS2003-XM XM FROM: CN Interchange London L McManus Coal Trestle PICKUP 32768 0 LPS5-XM XM DEST: L Track 4 London L MCR Freight Shed N SETOUT 32783 0 MNA3240-XM XM FROM: CN Interchange London L MCR Freight Shed N SETOUT 32783 1 NP47919-XM XM FROM: CN Interchange London L MCR Team PICKUP 32775 1 LPS212-FMcrates FMcr DEST: L Track 4 London L MCR Team SETOUT 32783 2 LPS200-FMlumber FMlu FROM: CN Interchange London L MCR Team SETOUT 32783 3 ACD28753-VA VA FROM: CN Interchange E London L Track 4 SETOUT 32768 0 LPS5-XM XM FROM: L McManus Coal Trestle E London L Track 4 SETOUT 32775 1 LPS212-FMcrates FMcr FROM: L MCR Team E London L Track 4 SETOUT 32781 0 LPS3-XM XM FROM: L Freight Shed 1 E London L Track 4 SETOUT 32782 0 GN25096-XM XM FROM: L Freight Shed 2 E London L Track 4 SETOUT 32782 3 LPS5-XM XM FROM: L Freight Shed 2 E London L Track 4 SETOUT 32783 0 MNA3240-XM XM FROM: CN Interchange E London L Track 4 SETOUT 32783 1 NP47919-XM XM FROM: CN Interchange E London L Track 4 SETOUT 32783 2 LPS200-FMlumber FMlu FROM: CN Interchange E London L Track 4 SETOUT 32783 3 ACD28753-VA VA FROM: CN Interchange E London L Track 4 SETOUT 32783 4 SPS2003-XM XM FROM: CN Interchange As you can see all of the pickups from the CN Interchange have 2 destinations, an industry in London AND L Track 4 in E London. Consequently, it is not possible to successfully complete the activity. Is this something else I am doing wrong or is it an "undocumented feature"? ![]() I do believe that there was a post about this some time back from Steve. I was just playing around with AG this evening. It only happens to me when I uncheck the "Check here for sequential pickup/setouts" box. If I leave it checked, I do not get the dual setouts. Jim |
|
|
![]()
Post
#3
|
|
![]() Switchman ![]() Group: Members Posts: 9 Joined: 28-April 07 From: United States Member No.: 57 ![]() |
I do believe that there was a post about this some time back from Steve. I was just playing around with AG this evening. It only happens to me when I uncheck the "Check here for sequential pickup/setouts" box. If I leave it checked, I do not get the dual setouts. Jim Jim, You are correct and I am guilty of not searching adequately before my post. In this thread http://skylinecomputing.com/forums/index.p...post&p=2060 Steve said that he thought he had resolved this issue. I guess the update hasn't been posted yet (v4.2.11 is dated 9/8/2008). I wonder if this issue is related to a similar problem where a pickup will be listed twice in the switch list (and in the activity). I will simply need to be patient and wait for the next update. -------------------- ...rich
|
|
|
![]() ![]() |
Lo-Fi Version | Time is now: 30th September 2025 - 09:16 PM |