IPB
viagra super force buy buy online

Welcome Guest ( Log In | Register )

Yard 1 and Yard 2
nbeveridge
post Jun 16 2009, 05:10 PM
Post #1


Train Master
*****

Group: Administrators
Posts: 550
Joined: 2-January 07
From: Texas
Member No.: 10



Some of you might have noticed the Yard 1 and Yard 2 routes, which are basically set up to accommodate yard switching only. I have downloaded these routes, but have not loaded them yet. If possible, I will create templates for these. If the tracks are not marked properly, then I will contact the route author to see about modifying the route files.


--------------------
Norman
Go to the top of the page
 
+Quote Post
 
Start new topic
Replies
jrmeindl
post Jun 17 2009, 11:55 AM
Post #2


Train Master
*****

Group: Members
Posts: 287
Joined: 6-January 07
From: United States
Member No.: 14



QUOTE(nbeveridge @ Jun 16 2009, 06:10 PM) *
Some of you might have noticed the Yard 1 and Yard 2 routes, which are basically set up to accommodate yard switching only. I have downloaded these routes, but have not loaded them yet. If possible, I will create templates for these. If the tracks are not marked properly, then I will contact the route author to see about modifying the route files.



Norm,

The first upload of this route had all automatic switches and the sidings were not marked properly for AG. The second upload corrected the switches, but the siding markers are still incorrect. Siding markers still need to corrected for AG. Some of the track is also pretty rough so you would have to use very slow speeds while switching.

Jim
Go to the top of the page
 
+Quote Post
nbeveridge
post Jun 17 2009, 01:23 PM
Post #3


Train Master
*****

Group: Administrators
Posts: 550
Joined: 2-January 07
From: Texas
Member No.: 10



QUOTE(jrmeindl @ Jun 17 2009, 11:55 AM) *
Norm,

The first upload of this route had all automatic switches and the sidings were not marked properly for AG. The second upload corrected the switches, but the siding markers are still incorrect. Siding markers still need to corrected for AG. Some of the track is also pretty rough so you would have to use very slow speeds while switching.

Jim


Thanks, Jim. I will get with the route author to see about fixing the track markers.


--------------------
Norman
Go to the top of the page
 
+Quote Post

Posts in this topic


Reply to this topicStart new topic
1 User(s) are reading this topic (1 Guests and 0 Anonymous Users)
0 Members:

 



Lo-Fi Version Time is now: 2nd October 2025 - 06:43 PM
viagra super force bitcoin