Cumbres Pass, Narrow Gauge templates |
Cumbres Pass, Narrow Gauge templates |
Sep 15 2009, 01:54 PM
Post
#1
|
|
![]() Train Master ![]() ![]() ![]() ![]() ![]() Group: Members Posts: 146 Joined: 26-March 07 From: United States Member No.: 48 |
I have just passed to Steve the template for the Cumbres Pass route. This is the second of a series of narrow gauge templates I am working on. The Silverton and the Cumbres Pass are small, 40 & 65 miles long. The next route is the Rio Grande Southern at 170 miles long and the last is the Colorado Southern at 315 miles long.
Pete |
|
|
|
![]() |
Oct 3 2009, 03:15 PM
Post
#2
|
|
|
Train Master ![]() ![]() ![]() ![]() ![]() Group: Administrators Posts: 550 Joined: 2-January 07 From: Texas Member No.: 10 |
I have just passed to Steve the template for the Cumbres Pass route. This is the second of a series of narrow gauge templates I am working on. The Silverton and the Cumbres Pass are small, 40 & 65 miles long. The next route is the Rio Grande Southern at 170 miles long and the last is the Colorado Southern at 315 miles long. Pete Just a note. An error was found in the K-27 loco which prevents the fireman (auto or manual) from adding coal to the firebox. The loco author (Capt. Bazza at Elvas Tower) has posted a fix in the forums at and temporarily withdrawn the loco from the Elvas Tower file library. I think that Pete plans to put the fix into the .eng file and repost this template. -------------------- Norman
|
|
|
|
xpdingo Cumbres Pass Sep 15 2009, 01:54 PM
xpdingo QUOTE(nbeveridge @ Oct 3 2009, 03:15 PM) ... Oct 3 2009, 06:16 PM
sgdavis QUOTE(xpdingo @ Oct 3 2009, 07:16 PM) The... Oct 4 2009, 05:37 AM![]() ![]() |
| Lo-Fi Version | Time is now: 28th October 2025 - 03:44 PM |