NC Piedmont Route |
NC Piedmont Route |
![]()
Post
#1
|
|
Conductor ![]() ![]() Group: Members Posts: 15 Joined: 15-January 10 Member No.: 23,148 ![]() |
I had a brief look at the new NC Piedmont Route. It appears to be complete enough for a template. Is anyone willing to have a go at it?
|
|
|
![]() |
![]()
Post
#2
|
|
Conductor ![]() ![]() Group: Members Posts: 11 Joined: 24-July 09 Member No.: 14,423 ![]() |
I had a brief look at the new NC Piedmont Route. It appears to be complete enough for a template. Is anyone willing to have a go at it? Nick, While the route is rather complete there are quite a few un-named sidings and tracks, something that needs to be corrected before a template could be started. Paul |
|
|
![]()
Post
#3
|
|
Engineer ![]() ![]() ![]() Group: Members Posts: 43 Joined: 22-July 07 Member No.: 76 ![]() |
I've diagrammed all but the last yard, and they are pretty good. But as you say, more of the sidings could be named.
|
|
|
![]()
Post
#4
|
|
Train Master ![]() ![]() ![]() ![]() ![]() Group: Administrators Posts: 550 Joined: 2-January 07 From: Texas Member No.: 10 ![]() |
I've diagrammed all but the last yard, and they are pretty good. But as you say, more of the sidings could be named. If we can get permission from the route author, we can name the sidings and then build a template. If someone would like to contact the route author and get permission, then we can have a go at it. -------------------- Norman
|
|
|
![]() ![]() |
Lo-Fi Version | Time is now: 12th September 2025 - 03:24 PM |