PRR Eastern, Template Started |
PRR Eastern, Template Started |
![]()
Post
#1
|
|
![]() Train Master ![]() ![]() ![]() ![]() ![]() Group: Members Posts: 146 Joined: 26-March 07 From: United States Member No.: 48 ![]() |
I have started on the template for the PRR Eastern route. This route is still being developed and the last part should be available to me by the end of the year.
When done it will contain some 4000 miles of track and 2500 sidings. Steve will be upgrading the limit of Activity Generator for this template. Pete |
|
|
![]() |
![]()
Post
#2
|
|
Conductor ![]() ![]() Group: Members Posts: 11 Joined: 24-July 09 Member No.: 14,423 ![]() |
I have started on the template for the PRR Eastern route. This route is still being developed and the last part should be available to me by the end of the year. When done it will contain some 4000 miles of track and 2500 sidings. Steve will be upgrading the limit of Activity Generator for this template. Pete Pete, This looks good and it is going to be a big job for sure. I know Norm worked very long and hard on the series of templates for an earlier version of the route that I helped beta test on and so I was wondering if these will be brought up to date and perhaps improved upon if that is possible? Paul |
|
|
![]() ![]() |
Lo-Fi Version | Time is now: 12th September 2025 - 10:58 AM |