NC Piedmont Corridor |
NC Piedmont Corridor |
Feb 20 2012, 07:02 AM
Post
#1
|
|
|
Train Master ![]() ![]() ![]() ![]() ![]() Group: Members Posts: 104 Joined: 4-January 07 From: Canada Member No.: 12 |
I was wondering if anyone tried to make a template for this route. I noticed that the last post was on Sept. 27/10. Maybe put on the back shelf and forgotten. From the maps that just came out it looks pretty good for switching. Thanks. Greg.
|
|
|
|
![]() |
Feb 20 2012, 11:13 AM
Post
#2
|
|
![]() Train Master ![]() ![]() ![]() ![]() ![]() Group: Members Posts: 146 Joined: 26-March 07 From: United States Member No.: 48 |
I was wondering if anyone tried to make a template for this route. I noticed that the last post was on Sept. 27/10. Maybe put on the back shelf and forgotten. From the maps that just came out it looks pretty good for switching. Thanks. Greg. Greg: I am involved with 2 huge templates right now. It will be along wait for me. The route is template ready although there are sidings that can be named. There are enough sidings to make a template. Why don't you try it. Steve has great tutorials here and you will find it to be a lot of fun. Pete |
|
|
|
ideaman NC Piedmont Corridor Feb 20 2012, 07:02 AM
ideaman Thanks for the update Pete. I will take a look at ... Feb 20 2012, 04:20 PM![]() ![]() |
| Lo-Fi Version | Time is now: 5th November 2025 - 10:32 AM |