Buffalo Route |
Buffalo Route |
Sep 30 2010, 07:02 PM
Post
#1
|
|
Train Master Group: Members Posts: 146 Joined: 26-March 07 From: United States Member No.: 48 |
I started this template about a year ago and then stopped it when Teemu told me he was going to extend it to Niagara Falls. Teemu sent me the new Buffalo route yesterday and I will work it along side the PRR Eastern. The Buffalo route is only about 60 miles long but it has almost 1300 sidings. It is a huge industrial switching route with 8 Railroads involved.
Teemu has done a great job on this route. Pete |
|
|
May 18 2012, 12:40 PM
Post
#2
|
|
Train Master Group: Members Posts: 148 Joined: 23-February 07 From: Leominster, MA United States Member No.: 29 |
Denis,
Can't wait for your DAR Template, back on subject I did a template for the Buffalo Beta 1 large Bethlehlem (Lackawana) Steel plant on the route my estimate is it is about 1/2 mile wide by a mile long. There are over 100+ marked tracks in and around the mill. Some of the downloads that will be required are hot metal cars, slag cars and ingot cars + 2 Bethlehem switchers and EMD SW and a 50 ton GE calf and cow. All of the rolling stock is from train-sim.com The only area I found problems was some of the curves on the north end of the mill scrap and teaming area, I needed a short wheel based spacer car to push the cars up the high line. There are so many siddings in the mill area it could be a complete temlate ins its self Peter -------------------- Peter
Arcadia Terminal Street & Dock Railroad |
|
|
Lo-Fi Version | Time is now: 12th July 2024 - 05:02 AM |