IPB
viagra super force buy buy online

Welcome Guest ( Log In | Register )

Milwaukee Road Idaho Division (known as the GAP), Oncoming template
dgionet
post Apr 9 2014, 08:04 PM
Post #1


Train Master
*****

Group: Members
Posts: 1,028
Joined: 4-February 07
From: Canada
Member No.: 21



Hello to all,

Following the release of the Milwaukee's Idaho Division, known as the GAP, I have started to take a look at it to build a template. The current route will have some challenges and interesting twists during construction of the templates. One of the interesting features of the oncoming template is the change of Motive Power the player will proceed in doing from Electric to Diesel at both Avery and Othello locations. This has been inspired with the release and testing of the PRR-Eastern template in which case Pete has provided some templates where the run switched from electric to diesel and vice-versa.

The player will have the choice of two sets of diesel engines to hook up to, six each to totalize 9500 hp, a mix of F-Units, GP7's sd7's and sd10's. Oh yes, I almost forgot; the main download will be the BLW Milwaukee Freight set. The electric Boxcabs and Little Joes ( From TrainSim) will be part of switching of motive power.

A major challenge found concerns the length of the sidings at Avery. They are very short and couldn't host a reasonably long consist if the template is being built the usual way. The longest siding along the mainline is no longer than eight cars.I found a way to overcome the sidings length issue in Avery, generated a SLG-Generated activity and successfully reached Avery with a reasonable number of cars. The second set of images will help you understand how this has been done.Inspiration for this one came from something similar done while building the DRGW Green River Template.

In Avery the second "Avery Siding" is about four cars in length ( based on a 18meter car average). In Malden, I have set up an activity to pickup cars on Malden Yard 2 siding. AG set the maximum to four, corresponding to the Avery siding limit. Once done the player simply has to hook up to a loose consist (about 45 cars long along the Malden siding, caboose is included) and proceed to Avery with it.

Here is the important part: as long as the four designated cars come inside the Avery Siding limits, whatever the location of these four cars within the consist, AG will end successfully the act. Here are the first set of images regarding change of motive power from Electric to diesel. The first five at Avery and the remaining four at Othello.



















The other images on the next post


--------------------
Denis Gionet
Go to the top of the page
 
+Quote Post
 
Start new topic
Replies
dgionet
post Apr 26 2014, 04:30 PM
Post #2


Train Master
*****

Group: Members
Posts: 1,028
Joined: 4-February 07
From: Canada
Member No.: 21



Hello to all,

Following the route update by Jerry Sullivan to add speed limits to the entire route, AI traffic had been checked and adjusted and added some more along the other RR's (NP, UP and GN) to take into account the slower speeds, especially between Avery and Plummer, which can take up to three hours and close to five up to Malden. I may have to adjust more depending of the outcome of the other templates that haven't been tested yet.

Benny is continuing testing and the outcome looks good so far.

I am including in the following post some screenshots of EB main, between Othello and Avery and on the next post WB MOW activities between Avery and Malden. Timing has been very good in meeting traffic from the UP (Plummer), the GN (Rosalia) and the NP (Warden)

The first set of shots from the EB template















see next post for the WBMOW template shots


--------------------
Denis Gionet
Go to the top of the page
 
+Quote Post

Posts in this topic


Reply to this topicStart new topic
2 User(s) are reading this topic (2 Guests and 0 Anonymous Users)
0 Members:

 



Lo-Fi Version Time is now: 11th November 2025 - 10:05 PM
viagra super force bitcoin