Buffalo Route |
Buffalo Route |
Sep 30 2010, 07:02 PM
Post
#1
|
|
Train Master Group: Members Posts: 146 Joined: 26-March 07 From: United States Member No.: 48 |
I started this template about a year ago and then stopped it when Teemu told me he was going to extend it to Niagara Falls. Teemu sent me the new Buffalo route yesterday and I will work it along side the PRR Eastern. The Buffalo route is only about 60 miles long but it has almost 1300 sidings. It is a huge industrial switching route with 8 Railroads involved.
Teemu has done a great job on this route. Pete |
|
|
Nov 22 2014, 04:46 PM
Post
#2
|
|
Train Master Group: Members Posts: 1,018 Joined: 4-February 07 From: Canada Member No.: 21 |
Hello to all,
Since my last post another set of templates has been finished for the South Buffalo (SBRR) railroad and currently finishing more templates for the Baltimore & Ohio (B&O) railroad. The SBRR serves the Bethlehem (BS) and Republic Steel (RS) plants as well as the Ford auto plant South of the Bethlehem plant. One template has been done for the RS, one for the BS, one for the Ford Plant and one delivering goods between the main yards in the BS area throuhgout the SBRR network. The current images show work starting at the SBRR Main Yard, moving among the main yards (not all of them) throughout the BS area, delivering or picking up cars with the final destination as the PC Lackawanna yard. The other way around is also present. Also the same principle with the PC Seneca yard as final destination or departure point along the SBRR. The shots: Will be posting later with some shots of the near completed B&0 Template -------------------- Denis Gionet
|
|
|
Lo-Fi Version | Time is now: 5th July 2024 - 05:19 PM |