Buffalo Route |
Buffalo Route |
Sep 30 2010, 07:02 PM
Post
#1
|
|
Train Master Group: Members Posts: 146 Joined: 26-March 07 From: United States Member No.: 48 |
I started this template about a year ago and then stopped it when Teemu told me he was going to extend it to Niagara Falls. Teemu sent me the new Buffalo route yesterday and I will work it along side the PRR Eastern. The Buffalo route is only about 60 miles long but it has almost 1300 sidings. It is a huge industrial switching route with 8 Railroads involved.
Teemu has done a great job on this route. Pete |
|
|
Nov 23 2014, 07:16 AM
Post
#2
|
|
Train Master Group: Members Posts: 1,021 Joined: 4-February 07 From: Canada Member No.: 21 |
Hello to all,
Here are shots of the now finished B&O Template. The first two are WB & EB. From the Main B&O Yard, the train reaches the EL Bison Yard network, making drops ( only) in the Canada, North and Receiving Yards. The user will have to go through the Classification Yards and then reverse with the proper switching to reach the Receiving yards.The WB, starting at the departure yard, does the same but picking up cars (only) before reaching the B&O Main Yard and adds the SK Yard and the BSOR Interchange as pickups. The final one is a local, servicing some of the industries to Ferro Corp with a return to the Yard. That includes the SBRR siding 9 used as an interchange siding between both lines. This area is heavy in resources. Make sure to adjust, especially the Object Density slider, that will help. The shots: More later. -------------------- Denis Gionet
|
|
|
Lo-Fi Version | Time is now: 4th August 2024 - 03:26 AM |