Buffalo Route |
Buffalo Route |
Sep 30 2010, 07:02 PM
Post
#1
|
|
Train Master Group: Members Posts: 146 Joined: 26-March 07 From: United States Member No.: 48 |
I started this template about a year ago and then stopped it when Teemu told me he was going to extend it to Niagara Falls. Teemu sent me the new Buffalo route yesterday and I will work it along side the PRR Eastern. The Buffalo route is only about 60 miles long but it has almost 1300 sidings. It is a huge industrial switching route with 8 Railroads involved.
Teemu has done a great job on this route. Pete |
|
|
Dec 19 2014, 09:38 PM
Post
#2
|
|
Train Master Group: Members Posts: 1,021 Joined: 4-February 07 From: Canada Member No.: 21 |
Hi to all,
Here's the first of a series of templates for the EL: handling unpowered locos to be serviced in the EL shops in the Bison Yard complex. It will be necessary to ask permission to the dispatcher (ALT-TAB) to move through every RED signal. There are three signals to cross. From the Service area in the Western section of the Bison Yard, the freeware SW8 (from TS) can move up to five locos to the repair shop, located in the Eastern section of the Yard. Shots of the successfull activity, done in about a hour. It consists of bringing five locos to be serviced to the repair shop and bringing back another five repaired locos to the service area. More later -------------------- Denis Gionet
|
|
|
Lo-Fi Version | Time is now: 1st August 2024 - 06:14 AM |