Buffalo Route |
Buffalo Route |
Sep 30 2010, 07:02 PM
Post
#1
|
|
Train Master Group: Members Posts: 146 Joined: 26-March 07 From: United States Member No.: 48 |
I started this template about a year ago and then stopped it when Teemu told me he was going to extend it to Niagara Falls. Teemu sent me the new Buffalo route yesterday and I will work it along side the PRR Eastern. The Buffalo route is only about 60 miles long but it has almost 1300 sidings. It is a huge industrial switching route with 8 Railroads involved.
Teemu has done a great job on this route. Pete |
|
|
Aug 8 2016, 11:25 AM
Post
#2
|
|
Train Master Group: Members Posts: 148 Joined: 23-February 07 From: Leominster, MA United States Member No.: 29 |
I'm having a great time with the route but ran into one snag. On the NIAJ template I can't get the electric locos to work, tried pan up and pan down and get no power.
They also won't run in explore mode. I'm running windows 10 and and open rails. All my files are in a C: MSTS1 folder, I can run all the desiel power OK. Any help will be apreciated. No rush as I'm love running the Alcos under the wire. Thanks Peter -------------------- Peter
Arcadia Terminal Street & Dock Railroad |
|
|
Lo-Fi Version | Time is now: 26th May 2024 - 06:59 PM |