Buffalo Route |
Buffalo Route |
Sep 30 2010, 07:02 PM
Post
#1
|
|
Train Master Group: Members Posts: 146 Joined: 26-March 07 From: United States Member No.: 48 |
I started this template about a year ago and then stopped it when Teemu told me he was going to extend it to Niagara Falls. Teemu sent me the new Buffalo route yesterday and I will work it along side the PRR Eastern. The Buffalo route is only about 60 miles long but it has almost 1300 sidings. It is a huge industrial switching route with 8 Railroads involved.
Teemu has done a great job on this route. Pete |
|
|
Aug 12 2016, 07:36 PM
Post
#2
|
|
Train Master Group: Members Posts: 1,019 Joined: 4-February 07 From: Canada Member No.: 21 |
Hi again Peter,
Found the culprit: have looked at the following ENG file for both NIAJ 15 ENG files and found this ( see line in BLUE): Simply change the word Diesel for Electric and this will resolve the issue. Have run successfully the loco with the changes made. -------------------- Denis Gionet
|
|
|
Aug 14 2016, 06:20 PM
Post
#3
|
|
Train Master Group: Members Posts: 148 Joined: 23-February 07 From: Leominster, MA United States Member No.: 29 |
Hi again Peter, Found the culprit: have looked at the following ENG file for both NIAJ 15 ENG files and found this ( see line in BLUE): Simply change the word Diesel for Electric and this will resolve the issue. Have run successfully the loco with the changes made. Denis, Thanks for the feed back, and the great templates this route has it all. Just an FYI the origional file from ET the engine type call out was correct, you may want to update the file that is in the template download. Peter -------------------- Peter
Arcadia Terminal Street & Dock Railroad |
|
|
Lo-Fi Version | Time is now: 28th July 2024 - 02:11 PM |