IPB
viagra super force buy buy online

Welcome Guest ( Log In | Register )

RF&P, Updated and extended
Conductor Chris
post Feb 5 2021, 04:29 PM
Post #1


Train Master
*****

Group: Members
Posts: 77
Joined: 19-August 12
Member No.: 297,298



I have a beta version of Steve Davis' RF&P route, now extended all the way to Richmond. Release will be soon. Who wants to make a new template?
Go to the top of the page
 
+Quote Post
 
Start new topic
Replies
dgionet
post Mar 30 2021, 04:44 PM
Post #2


Train Master
*****

Group: Members
Posts: 1,028
Joined: 4-February 07
From: Canada
Member No.: 21



Hi to all,

Here are shots from the newly done DAHLGREN LOCAL run template.
Here are how this one works:

You are in command of two (2) c40-8’s (7599 & 7492) and will be servicing the Dahlgren Branch with a return trip back to the ACCA Yard. You will pickup your load (20 cars maximum) in the ACCA Yard and must put your second engine (7492) in the back of the train, thus making your train a push-pull configuration. The Dahlgren Branch has no runaround track to reverse your engines. For the return trip, your back engine (7492) will become the lead engine and the lead engine (7599) will become your back engine. You will be switching cabs (Ctrl+E) to return back home

Dahlgren (1) by Denis Gionet, sur Flickr

Dahlgren (2) by Denis Gionet, sur Flickr

Dahlgren (3) by Denis Gionet, sur Flickr

Dahlgren (4) by Denis Gionet, sur Flickr

Dahlgren (5) by Denis Gionet, sur Flickr

Dahlgren (6) by Denis Gionet, sur Flickr
The remaining pictures on the next post


--------------------
Denis Gionet
Go to the top of the page
 
+Quote Post

Posts in this topic


Reply to this topicStart new topic
1 User(s) are reading this topic (1 Guests and 0 Anonymous Users)
0 Members:

 



Lo-Fi Version Time is now: 12th September 2025 - 07:28 AM
viagra super force bitcoin