NC Piedmont Corridor |
NC Piedmont Corridor |
Feb 20 2012, 07:02 AM
Post
#1
|
|
Train Master Group: Members Posts: 104 Joined: 4-January 07 From: Canada Member No.: 12 |
I was wondering if anyone tried to make a template for this route. I noticed that the last post was on Sept. 27/10. Maybe put on the back shelf and forgotten. From the maps that just came out it looks pretty good for switching. Thanks. Greg.
|
|
|
Feb 20 2012, 11:13 AM
Post
#2
|
|
Train Master Group: Members Posts: 146 Joined: 26-March 07 From: United States Member No.: 48 |
I was wondering if anyone tried to make a template for this route. I noticed that the last post was on Sept. 27/10. Maybe put on the back shelf and forgotten. From the maps that just came out it looks pretty good for switching. Thanks. Greg. Greg: I am involved with 2 huge templates right now. It will be along wait for me. The route is template ready although there are sidings that can be named. There are enough sidings to make a template. Why don't you try it. Steve has great tutorials here and you will find it to be a lot of fun. Pete |
|
|
Feb 20 2012, 04:20 PM
Post
#3
|
|
Train Master Group: Members Posts: 104 Joined: 4-January 07 From: Canada Member No.: 12 |
Thanks for the update Pete. I will take a look at the tutorials, but pushing 80 I don't think I have the ware withall to do it. Best of luck on the work you are doing now. Thanks for all the templates that you've done and other contriubuters that has made MSTS much more enjoyable.Greg.
|
|
|
Lo-Fi Version | Time is now: 23rd April 2024 - 04:30 PM |