Yard 1 and Yard 2 |
Yard 1 and Yard 2 |
Jun 16 2009, 05:10 PM
Post
#1
|
|
Train Master Group: Administrators Posts: 550 Joined: 2-January 07 From: Texas Member No.: 10 |
Some of you might have noticed the Yard 1 and Yard 2 routes, which are basically set up to accommodate yard switching only. I have downloaded these routes, but have not loaded them yet. If possible, I will create templates for these. If the tracks are not marked properly, then I will contact the route author to see about modifying the route files.
-------------------- Norman
|
|
|
Jun 17 2009, 11:55 AM
Post
#2
|
|
Train Master Group: Members Posts: 287 Joined: 6-January 07 From: United States Member No.: 14 |
Some of you might have noticed the Yard 1 and Yard 2 routes, which are basically set up to accommodate yard switching only. I have downloaded these routes, but have not loaded them yet. If possible, I will create templates for these. If the tracks are not marked properly, then I will contact the route author to see about modifying the route files. Norm, The first upload of this route had all automatic switches and the sidings were not marked properly for AG. The second upload corrected the switches, but the siding markers are still incorrect. Siding markers still need to corrected for AG. Some of the track is also pretty rough so you would have to use very slow speeds while switching. Jim |
|
|
Jun 17 2009, 01:23 PM
Post
#3
|
|
Train Master Group: Administrators Posts: 550 Joined: 2-January 07 From: Texas Member No.: 10 |
Norm, The first upload of this route had all automatic switches and the sidings were not marked properly for AG. The second upload corrected the switches, but the siding markers are still incorrect. Siding markers still need to corrected for AG. Some of the track is also pretty rough so you would have to use very slow speeds while switching. Jim Thanks, Jim. I will get with the route author to see about fixing the track markers. -------------------- Norman
|
|
|
Jun 19 2009, 06:32 PM
Post
#4
|
|
Train Master Group: Members Posts: 287 Joined: 6-January 07 From: United States Member No.: 14 |
|
|
|
Jun 22 2009, 04:08 PM
Post
#5
|
|
Train Master Group: Administrators Posts: 550 Joined: 2-January 07 From: Texas Member No.: 10 |
Some of you might have noticed the Yard 1 and Yard 2 routes, which are basically set up to accommodate yard switching only. I have downloaded these routes, but have not loaded them yet. If possible, I will create templates for these. If the tracks are not marked properly, then I will contact the route author to see about modifying the route files. The Yard 1 template is complete, and has been passed to Steve. Yard 2 is underway. Something is wrong with the Yard 3 route. Any attempt to create an activity, whether with the original route or with the fix, corrupts the activity. I have contacted the route author. -------------------- Norman
|
|
|
Jun 22 2009, 05:09 PM
Post
#6
|
|
Train Master Group: Members Posts: 287 Joined: 6-January 07 From: United States Member No.: 14 |
The Yard 1 template is complete, and has been passed to Steve. Yard 2 is underway. Something is wrong with the Yard 3 route. Any attempt to create an activity, whether with the original route or with the fix, corrupts the activity. I have contacted the route author. Norm, Sent you a PM and email regarding Yard 3. Jim |
|
|
Lo-Fi Version | Time is now: 29th April 2024 - 02:55 AM |