ABL Alameda Belt Line typo |
ABL Alameda Belt Line typo |
Jan 31 2010, 08:59 AM
Post
#1
|
|
Train Master Group: Members Posts: 148 Joined: 23-February 07 From: Leominster, MA United States Member No.: 29 |
Norm,
Good morning, this is a great little route, lots of switching. Even with a 12 car train it can take over 3 hrs to complete switch list due to the limited number of passing tracks. I did find one minor typo in your ABL Downloads.txt document, the sfrbbox1.zip file is listed twice but the second file should be sfrebox1.zip. Thanks for all your work. Peter -------------------- Peter
Arcadia Terminal Street & Dock Railroad |
|
|
Feb 7 2010, 02:16 PM
Post
#2
|
|
Train Master Group: Administrators Posts: 550 Joined: 2-January 07 From: Texas Member No.: 10 |
Norm, Good morning, this is a great little route, lots of switching. Even with a 12 car train it can take over 3 hrs to complete switch list due to the limited number of passing tracks. I did find one minor typo in your ABL Downloads.txt document, the sfrbbox1.zip file is listed twice but the second file should be sfrebox1.zip. Thanks for all your work. Peter THANKS for the feed back. I'll make the correction and get it posted. -------------------- Norman
|
|
|
Lo-Fi Version | Time is now: 18th April 2024 - 04:30 PM |