Printable Version of Topic

Click here to view this topic in its original format

Skyline User's Forum _ Templates _ PRR Eastern

Posted by: xpdingo Aug 23 2010, 10:59 AM

I have started on the template for the PRR Eastern route. This route is still being developed and the last part should be available to me by the end of the year.
When done it will contain some 4000 miles of track and 2500 sidings. Steve will be upgrading the limit of Activity Generator for this template.

Pete

Posted by: LehighNorthern Aug 23 2010, 11:30 AM

QUOTE(xpdingo @ Aug 23 2010, 12:59 PM) *
I have started on the template for the PRR Eastern route. This route is still being developed and the last part should be available to me by the end of the year.
When done it will contain some 4000 miles of track and 2500 sidings. Steve will be upgrading the limit of Activity Generator for this template.

Pete


Pete,

This looks good and it is going to be a big job for sure. I know Norm worked very long and hard on the series of templates for an earlier version of the route that I helped beta test on and so I was wondering if these will be brought up to date and perhaps improved upon if that is possible?

Paul

Posted by: xpdingo Aug 23 2010, 12:29 PM

QUOTE(LehighNorthern @ Aug 23 2010, 11:30 AM) *
Pete,

This looks good and it is going to be a big job for sure. I know Norm worked very long and hard on the series of templates for an earlier version of the route that I helped beta test on and so I was wondering if these will be brought up to date and perhaps improved upon if that is possible?

Paul


Paul:

This series of templates are new from the rolling stock on down. I believe I have found a way to improve on the railfill with such a large route.

Pete

Posted by: LehighNorthern Aug 23 2010, 02:52 PM

QUOTE(xpdingo @ Aug 23 2010, 02:29 PM) *
Paul:

This series of templates are new from the rolling stock on down. I believe I have found a way to improve on the railfill with such a large route.

Pete


That is great because that is one of the routes I run most frequently. The route, even at the present is extremely large and the multiple templates were required to be able to efficiently work a train. Some activities generated with the old templates take the better part of a day to complete.

Paul

Powered by Invision Power Board (http://www.invisionboard.com)
© Invision Power Services (http://www.invisionpower.com)