IPB
viagra super force buy buy online

Welcome Guest ( Log In | Register )

East Metro Upgrade, Prime Route for a Template
nbeveridge
post Jun 17 2008, 01:00 PM
Post #1


Train Master
*****

Group: Administrators
Posts: 550
Joined: 2-January 07
From: Texas
Member No.: 10



Would anyone care to do this template?


--------------------
Norman
Go to the top of the page
 
+Quote Post
 
Start new topic
Replies
Old Geaser
post Jun 23 2008, 09:13 AM
Post #2


Train Master
*****

Group: Members
Posts: 82
Joined: 22-November 07
From: Gold Bar, WA
Member No.: 125



Sure hope someone makes a template for this route. It is a great route for switching. I have worked most of the activities and am looking forward to running my own Skyline generated work orders. Always liked to be my own boss.

Bert rolleyes.gif



Go to the top of the page
 
+Quote Post
nbeveridge
post Jun 24 2008, 06:15 AM
Post #3


Train Master
*****

Group: Administrators
Posts: 550
Joined: 2-January 07
From: Texas
Member No.: 10



QUOTE(Old Geaser @ Jun 23 2008, 09:13 AM) *
Sure hope someone makes a template for this route. It is a great route for switching. I have worked most of the activities and am looking forward to running my own Skyline generated work orders. Always liked to be my own boss.

Bert rolleyes.gif


I will put it on my list. Seems like the list gets longer, rather than shorter!

Bert, can you advise if the track switches are manual, or are they locked? I.e. do only the paths open the switches, or can you change them at will?


--------------------
Norman
Go to the top of the page
 
+Quote Post
Old Geaser
post Jun 24 2008, 04:17 PM
Post #4


Train Master
*****

Group: Members
Posts: 82
Joined: 22-November 07
From: Gold Bar, WA
Member No.: 125



I have found that it is a mixed bag. As I recall most of the main line are pre set and the others are manual. I remember one that was pre set going into CL LL Coal plant and after dropping the load, I could not get back to the main. Finally had to back up, go past the coal plant and on to the main past the coal plant.. Not sure why. Just keeping us on our toes I guess,

There is one engine that is driving me crazy. It is a small switcher called EMRR Krenshaw GE4T on # 1. It is used in the 1st 4 acts. Every time I touch the brakes (Using RailDriver) I have to hit the ; key to release the brake. Nice little engine but the brake thing is a bummer.

I think this route will be fun using our own generated acts. It is like a lay ed back easy going route with quite a few businesses and industries. Great scenery. There is no wye's on the route. Lots of front connections. I find there is no problems with connecting to the front, but I have had a lot of hard disconnects, even with the rear connections.

Waiting for a template.

Bert




QUOTE(nbeveridge @ Jun 24 2008, 05:15 AM) *
I will put it on my list. Seems like the list gets longer, rather than shorter!

Bert, can you advise if the track switches are manual, or are they locked? I.e. do only the paths open the switches, or can you change them at will?

Go to the top of the page
 
+Quote Post

Posts in this topic


Reply to this topicStart new topic
1 User(s) are reading this topic (1 Guests and 0 Anonymous Users)
0 Members:

 



Lo-Fi Version Time is now: 27th April 2024 - 11:40 AM
viagra super force bitcoin