The Green River Route needs a template maker |
The Green River Route needs a template maker |
Jul 7 2011, 06:41 PM
Post
#1
|
|
Engineer Group: Members Posts: 30 Joined: 7-September 07 Member No.: 102 |
This route has been out for a couple of months now. It is without a doubt one of the best payware route I've bought. I'm a little surprised that there hasn't been any mention here about a template for it. How about it anyone up for this route. What about you Pete you've done the other Grande route. Or you Norm. |
|
|
Oct 7 2011, 05:40 PM
Post
#2
|
|
Train Master Group: Members Posts: 1,017 Joined: 4-February 07 From: Canada Member No.: 21 |
Hello to all,
Al and Benny have been working hard beside me in improving the templates. Reports from both led to creating an 11th template: the COAL template. Testing of both paths (from the EB and the WB) starting at Wash generated problems. Using the Wash area as source tracks led to mixed freight consists rather than only coal loads. Even if the sidings were selected as work tracks, it mostly generated insufficient numbers of coal cars to reflect the reality. I am resending some changes to both regarding a new traffic pattern in the COAL template. Both had experienced crashes with the original pattern and will wait for their reports with the new configuration. I have completed both segments of the Potash local route and the route upgrade has worked well. I am including some shots, the first from the EB ( at Mounds) and the other four from the second segment of the Potash local inside the Potash route. Reaching the Eastern end of the route will automatically end the activity as shown here. More updates later -------------------- Denis Gionet
|
|
|
Lo-Fi Version | Time is now: 14th May 2024 - 07:44 AM |