IPB
viagra super force buy buy online

Welcome Guest ( Log In | Register )

East Metro V2
smokeytc
post Aug 3 2009, 08:50 AM
Post #1


Train Master
*****

Group: Members
Posts: 121
Joined: 4-June 08
From: Canada (Ontario)
Member No.: 164



Using Train Store -Unstored Everything. Made new activity using template emrr south bound (also tried one North Bound). Activity starts ok and got all cars hooked up - then started south and no switches would work -either going into a siding or trying to back in. This happens in every town along the way. Went out of act. and made all switches "manual", back in re-saved and restarted and switches still won't work???? Anyone else having this problem?? Any fix??
Norm ? Steve? Help (I like the route but this is frustrating)..
Ted
Go to the top of the page
 
+Quote Post
 
Start new topic
Replies
nbeveridge
post Aug 5 2009, 09:44 PM
Post #2


Train Master
*****

Group: Administrators
Posts: 550
Joined: 2-January 07
From: Texas
Member No.: 10



QUOTE(smokeytc @ Aug 3 2009, 08:50 AM) *
Using Train Store -Unstored Everything. Made new activity using template emrr south bound (also tried one North Bound). Activity starts ok and got all cars hooked up - then started south and no switches would work -either going into a siding or trying to back in. This happens in every town along the way. Went out of act. and made all switches "manual", back in re-saved and restarted and switches still won't work???? Anyone else having this problem?? Any fix??
Norm ? Steve? Help (I like the route but this is frustrating)..
Ted


Are you sure that you waited until AG had reset the track switches to manual? I have experienced selecting the change, and then exiting too soon, i.e. before the final message comes up (there are two). In this case, if the final message does not come up on the screen, then the change has not been made. It is not instantaneous, and can take quite a few seconds.

Also, when we tested this template, we found no track switches which would not reset.

Do you have the latest version of AG?


--------------------
Norman
Go to the top of the page
 
+Quote Post
smokeytc
post Aug 6 2009, 01:23 PM
Post #3


Train Master
*****

Group: Members
Posts: 121
Joined: 4-June 08
From: Canada (Ontario)
Member No.: 164



QUOTE(nbeveridge @ Aug 5 2009, 11:44 PM) *
Are you sure that you waited until AG had reset the track switches to manual? I have experienced selecting the change, and then exiting too soon, i.e. before the final message comes up (there are two). In this case, if the final message does not come up on the screen, then the change has not been made. It is not instantaneous, and can take quite a few seconds.

Also, when we tested this template, we found no track switches which would not reset.

Do you have the latest version of AG?


Yes - both messages came up. This happened using both NB and SB templates. I have Version 4.2.11 of AG is that current??
This is not a one time thing or I wouldn't have bothered you. It is ongoing- 3-4 tries. Don't know what else to try.
Ted
Go to the top of the page
 
+Quote Post
nbeveridge
post Aug 6 2009, 10:19 PM
Post #4


Train Master
*****

Group: Administrators
Posts: 550
Joined: 2-January 07
From: Texas
Member No.: 10



QUOTE(smokeytc @ Aug 6 2009, 01:23 PM) *
Yes - both messages came up. This happened using both NB and SB templates. I have Version 4.2.11 of AG is that current??
This is not a one time thing or I wouldn't have bothered you. It is ongoing- 3-4 tries. Don't know what else to try.
Ted


Do you have other templates which work correctly? Do you have other routes where the track switches will convert to manual? Have you tried them (templates and track switch conversion) since you have had this trouble with EMRR2?


--------------------
Norman
Go to the top of the page
 
+Quote Post

Posts in this topic


Reply to this topicStart new topic
2 User(s) are reading this topic (2 Guests and 0 Anonymous Users)
0 Members:

 



Lo-Fi Version Time is now: 1st October 2025 - 12:26 AM
viagra super force bitcoin