Wellsville, Addison & Galeton route |
Wellsville, Addison & Galeton route |
![]()
Post
#1
|
|
Train Master ![]() ![]() ![]() ![]() ![]() Group: Members Posts: 1,028 Joined: 4-February 07 From: Canada Member No.: 21 ![]() |
Hi to all, I have taken a look at this new route available today at TS. Not that many sidings inside the route (about 20-30) but are well marked and would be an interesting candidate for my first template with AG4. It is a very scenic route. It has multiple branches too. You can see some screenshots of the route at MLT downloads com. For you scenic route lovers, I believe this is one route for you to download. I have yet to explore and discover other areas of the route. Denis -------------------- Denis Gionet
|
|
|
![]() |
![]()
Post
#2
|
|
Train Master ![]() ![]() ![]() ![]() ![]() Group: Members Posts: 1,028 Joined: 4-February 07 From: Canada Member No.: 21 ![]() |
Hi to all, Here's some update about the WAG route. I was able to get in touch with the creator of the route, Paul Raynes. The route is expected to be reloaded at TS. Good news. About the template, it is now finished and is in the testing phase. Five paths are included in the WAG template. Although the route itself has only 25 marked sidings , which is small by standards, running the template will be everything but boring. Material used will be exclusively WAG, not even MSTS default in order to keep the length of the rolling stock short because of the mountainous aspect of the route which has lots of sharp twists and turns. The main player engines are F7's and are a beauty to see on the line. I did have some coupler problems to deal with at the Wellsville area and was able to set the path and had to remove one (and was the only) non-WAG rolling stock to resolve the issue The Wellsville branch has within its limits a grade of 2.85%. I have yet to find the exact area where it is. The route has no signaling, neither has mileposts. AI trains ( lots of it) will be present along the route. Precise timing have been set for all of them There are many crossovers with the NYC and C&FP Railroads. Since there is no signaling inside the route, engineers will have to be very vigilant at these crossovers and check for AI trains before proceeding ahead. No boring task here in the Wellsville, Addison and Galeton rail line. Check for the re-uploading of the route at TS this week-end or later in the next few days. I am continuing the testing of the route, have to work on the docs and hope to send it within the next week. I am starting my vacation today and expected to stay around thus able to finish the testing more quickly and sending to Steve for his approval before uploading. Denis -------------------- Denis Gionet
|
|
|
![]() ![]() |
Lo-Fi Version | Time is now: 12th September 2025 - 11:07 AM |