IPB
viagra super force buy buy online

Welcome Guest ( Log In | Register )

AI traffic on Lehigh & Hudson River 4
AT RR
post Dec 4 2011, 02:30 PM
Post #1


Train Master
*****

Group: Members
Posts: 148
Joined: 23-February 07
From: Leominster, MA United States
Member No.: 29



Hi everyone,
I have been trying to run this route but have been running into a stand off situation with the AI traffic and have yet been able to finish a work order.

The AI traffic is a great add on to the route but the problem I am seeing is the route has signals at interlocking and passing sidings but it also has block signals along long single track areas.

These single track block signals is the area where I get the stand off situations.

The question is: is there a way to change the AI path so the trains only stop at interlocking and passing sidings? Or can the signal file be modified so the AI trains do not look at the block signal as an interlocking signal?

I know I can run the route without AI traffic but this makes for a very barren railroad.

I'm asking these questions as all of the templates I developed for the Jersey City route did not have AI traffic so I don't know the first thing about this subject.

Peter


--------------------
Peter

Arcadia Terminal Street & Dock Railroad
Go to the top of the page
 
+Quote Post

Posts in this topic


Reply to this topicStart new topic
2 User(s) are reading this topic (2 Guests and 0 Anonymous Users)
0 Members:

 



Lo-Fi Version Time is now: 12th September 2025 - 01:03 AM
viagra super force bitcoin