Coal Mine Turns |
Coal Mine Turns |
May 7 2008, 11:08 AM
Post
#1
|
|
Conductor Group: Members Posts: 12 Joined: 22-April 08 From: Lancaster, CA USA Member No.: 155 |
Hello All,
I'm trying to get a handle on makeing turns for the NS Pokey Route. I don't seem to be able to get one that is what I was looking for. What i see in my mined is being able to take string of empties to a mine and pick up a load of full cars. Also I see a thru train bring empties, and droping of at differance yards. When I make a turn in AGv4 I pick a yard track to start, then the mine industries tracks to switch out then back to where I started. This seems to be the way real RR work. What am I doing wrong, or can this be done the way I invisioned it. Thanks, Ed Lewis (edl) Lancaster, CA |
|
|
Lo-Fi Version | Time is now: 20th May 2024 - 03:54 AM |